AI Hardware
Full AI compute supply chain: wafers, EDA, chips, optics, servers, cooling, power and data centers
Upstream Β· Materials & Equipment
Semiconductor EquipmentWafer-fab equipment β ASMLs litho monopoly plus the AMAT/LRCX/KLAC oligopoly
Wafers & MaterialsWafers, gases & CMP consumables β scale linearly with wafer volume
Advanced Packaging / OSATAdvanced packaging (CoWoS) β TSMC-led, the key AI-chip capacity bottleneck
EDA & IPEDA & IP β the Synopsys/Cadence/Arm chokehold on every chip design
Wafer FoundryWafer foundry β TSMCs near-monopoly on leading-edge nodes
HBM & MemoryHBM memory β AI compute bottleneck, both volume and price rising
Midstream Β· Compute Silicon
Merchant GPU & AcceleratorsAI compute core β Nvidia dominant, AMD chasing
Custom AI ASIC EnablersCustom-ASIC enablers β Broadcom/Marvell ride hyperscaler in-house silicon
CPUData-center CPUs β general compute paired with AI servers
Interconnect / Retimers / TimingInterconnect/retimers/timing β the connectivity lifeline of AI clusters
Optical Engines / CPO / Silicon PhotonicsSilicon photonics & CPO β next-gen optical interconnect cutting link power
Optical TransceiversOptical transceivers β direct beneficiaries of AI bandwidth upgrades
Downstream Β· Systems & Assembly
AI Servers / ODMAI servers/ODM β final assembly where compute is built
Contract Mfg / EMSContract mfg/EMS β outsourced production of servers and networking gear
Networking SwitchesSwitches β Arista vs white-box battling for AI networking
Storage SystemsStorage systems β substrate for AI data lakes and training data
PCB / Connectors / CablingHigh-speed PCB/connectors β the physical layer of AI racks
Thermal / Liquid CoolingLiquid cooling β a must for high-power racks, adoption rising fast
Power Delivery & ManagementPower delivery β critical as rack power density soars
Infrastructure Β· Data Center
Neoclouds / GPU CloudsNeoclouds β high-beta upstarts renting out GPU compute
Data-Center REITsData-center REITs β the landlords of compute collecting rent
DC Power & GenerationDC power & generation β power is AIs top constraint; nuclear/gas benefit
DC Construction & EngineeringDC construction β riding the global data-center build-out
Theme lists curated by Claude and may have gaps; quotes live. Research only, not investment advice. Β· Updated 2026-06-28